Our Projects

Client: NLNG

Status: ONGOING

Installation Supervision of the following activities
1.) Full decommissioning of existing old Mark6 Turbine control system
2.) Removal of old panel and positioning of the new one are at Company’s care, as per Matrix of Responsibility. Upgrade of Water wash panel and integration to Mark VIe
3.) Interface and integration check activities with DCS and Fire and Gas systems
4.) Commissioning and start-up of the upgraded Mark Vie turbine control Systems
5.) As Built’ drawings and documentation

Client: NLNG

Status: COMPLETED

 

Install, supervise and commission a fully functional ten (10) units of Mark Vie Triple Modular Redundant (TMR) turbine controller;
EX2100e generator excitation systems; additional functionality for Hazardous gas, Switches to transmitters upgrade and water wash
PLC integration; Servers and Network switches of General Electric (GE) Gas Turbine Generators.

Client: WRPC

Status: COMPLETED

Filter House Maintenance, Exhaust System, Duct, Diffuser, Baffles And Silencers Reconstruction, Compressor and Casing
Repairs Provision for Hotel Accommodation, Transportation and Shipping of Parts To Site, Workmanship

Client: WRPC

Status: ONGOING

 

Major Inspection spares of Gas Turbines 1 & 2 for WRPC – Warri Refining and Petrochemical Company

Client: WRPC

Status: COMPLETED

 

Supply of G.E certified instrumentation spares as follows:

  • Thermocouple (2 UNITS)
  • Connector Therm (10 Units)
  • Switch LIM
    (1 Unit)
  • Check Valve (10 Units)
  • Tube
  • Adapter
  • Radiation Shield (10 Units)
  • Various specific Adapters (4Units)
  • Screw Cork (2 Units)
  • Transducer (1 Unit)
  • Shipping and Delivery to Site

Client: OCTOLIT

Status: COMPLETED

 

Complete Supply of Gas Turbine Parts

Client: CMEC

Status: COMPLETED

 

Complete Supply Turbine Spare Parts for the Omotosho Simple Cycle 500mw Phase II